Accuracy You Can See, Efficiency You Can Measure
Trimble Marine Construction Software & Hardware Solutions
Empower your dredging and marine construction operations with Trimble's comprehensive marine solution — delivering real-time visualization and clarity below the waterline that help you maximize efficiency and secure more bids.
Schedule Your ConsultationTrimble Marine Construction (TMC) Software Systems
Real-time 3D guidance and positioning for precise dredging, material placement, & pile driving operations
- Real-time 3D underwater visualization
- Centimeter-level accuracy dredging/placing material to design depth
- Automated volume tracking and reporting
- 24/7 operation capability
Trimble Marine Construction (TMC) Hardware Systems
Integrated GNSS receivers and rugged sensors designed for marine construction operations
- GNSS receiver systems
- Real-time sensor suites, specific to application
- Marine-grade durability
- Seamless TMC software integration
Real Results from Marine Contractors like You
See how Trimble solutions have helped contractors increase margins, reduce project timelines, and win more bids
For the vertical piles, it took 40 to 50 percent less time.
Alva Construction Ltd. Piling Project
Challenge: Positioning piles and adjusting batter angles required crew in rafts—time-consuming and unsafe. With 180 total piles to install on a wharf replacement project in Little Dover, Nova Scotia, the contractor needed a safer method.
Solution: TMC software with GPS system on barge-mounted crane for real-time pile positioning, using color-coded display to guide operators to exact locations and angles.
Result: 40-50% time reduction for vertical piles, improved safety by eliminating raft work.
Real-time 3D surface models for faster, more efficient and precise earthmoving projects.
Manson Construction Mile Point Project
Challenge: Traditional earthmoving required time-consuming manual surveys and measurements.
Solution: Trimble's real-time 3D surface modeling with GPS/GNSS positioning integrated into equipment, utilizing consistent sensor systems maintained throughout the project duration to ensure continuous accuracy and reliable baseline measurements.
Result: Faster project completion, improved grading accuracy, reduced manual rework and surveying, with minimized recalibration needs and proven sensor performance from project start to finish.
We saved 15-20% on the dredging by having real-time underwater data. That's a six-figure cost savings.
Advanced American Construction - Port of Kalama Dredging Project
Challenge: Precise dredging to avoid costly over-dredging penalties while tracking production underwater in real-time.
Solution: Trimble Marine Construction with real-time 3D visualization integrated with a single beam echo sounder, allowing operators to track bucket location and monitor completed work underwater from the cab.
Result: 15-20% faster dredging (six-figure cost savings), improved pile driving accuracy from 64-108 inches to less than 2 inches, and better owner communication through verified data.
Watch TMC in Action: Precision Dredging Simplified
See real-time 3D guidance transforming a complex dredging project, brought to you by our marine construction expert, Nathan Keys. Learn how operators achieve design depth on the first pass, eliminating costly rework and project delays.
Trusted by leading marine contractors • Save 15-20% on project costs
Ready to Get 20/20 Vision Below the Surface?
To start dredging, material placement & pile driving with confidence, schedule a one-on-one consultation with a marine solutions expert today. We'll tailor the experience to your fleet and typical project scope.
Schedule Your Consultation